







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHome Additions & ADU Near You in Glendale, CA
Home additions and ADUs in Glendale, CA typically cost between $95,000 and $340,000 depending on whether you’re building a detached 800-square-foot unit or pushing out a two-story family room, and the written price comes before anyone picks up a tool. We quote every addition as a flat number with a written scope and a written warranty, so you can compare two bids side by side instead of guessing at allowances. Call (844) 320-5930 and a live person answers, day or night, and we’ll set a site visit.
Rowan Construction Group Glendale builds for homeowners in Glendale who bought into the hills, the Verdugo flats, or the Rossmoyne historic district between 2015 and 2025 and now need the square footage they couldn’t afford to buy next door. We run this work under The Haven Standard: Clause 1 means the price is written before any work starts, and no change proceeds without a signed change order.

Fast, Local Home Additions & ADU
A site visit in Glendale is usually scheduled within a few business days of your call, and the written quote follows once we’ve measured the lot, checked the setback on your parcel, and pulled the title. We answer the phone 24/7 with a live person, so an after-hours call about a stalled permit or a contractor who walked is still answered by someone who can book a walkthrough.
Coverage runs from the Glendale foothills and Adams Hill through the Verdugo Woodlands, and out to La Cañada Flintridge, La Crescenta-Montrose, Pasadena, Altadena, South Pasadena, San Marino, and Alhambra. Same-day written quotes aren’t realistic for an addition – the number depends on soil, setbacks, and utility routing – but same-day scheduling is, and so is a same-day second opinion on a quote you already have. Bring a competitor’s estimate and we’ll review it line by line at no charge.
- Written flat price before any work starts
- Signed change orders on every scope change, no exceptions
- Documented photo record on every site visit, included as standard
- Background-checked, uniformed technicians, up to 19 years of experience
- 365-Day Done Right Promise: if it’s not done right, we make it right
What an Addition or ADU Costs in Glendale
Glendale pricing runs higher than most of the San Gabriel Valley because of hillside foundations and the city’s design review process. A flat-lot addition in the Verdugo flats and a pier-and-grade-beam hillside addition in the Glenoaks Canyon are not the same project, and the quotes shouldn’t pretend they are. Here are the ranges we work from when we write a Glendale scope.
| Project type | Typical Glendale range |
|---|---|
| Attached addition, 400 – 600 sq ft, flat lot | $95,000 – $175,000 |
| Detached ADU, 600 – 800 sq ft | $185,000 – $285,000 |
| Garage conversion ADU, 400 – 500 sq ft | $120,000 – $180,000 |
| Second-story addition, 700 – 1,000 sq ft | $240,000 – $340,000 |
| Site survey, title check, and design coordination | $4,500 – $12,000 |
Those numbers include the trades we self-perform and the subcontracted work we manage, and they hold because of the change order discipline: a signed document before any change in scope, which is why Rowan projects finish within a few percent of the agreed cost across 4,000-plus jobs since 2007. If a bid you’re holding is 30 percent under these ranges, ask what’s excluded – the plumbing tie-in, the trenching, the Title 24 compliance, or all three.

Areas We Cover
Glendale is the center of our footprint, and the additions we build radiate out from it. In the hills above Chevy Chase Canyon and in the Verdugo Woodlands, we regularly see sloped lots that need pier-and-grade-beam foundations and retaining walls, which adds roughly $18,000 to $45,000 over a flat-lot scope. In La Cañada Flintridge and La Crescenta-Montrose, the fire zone requirements drive up window ratings and roof assembly spec, and we price those explicitly rather than burying them.
We also build in Pasadena, Altadena, South Pasadena, San Marino, and Alhambra, where lot sizes and historic-district rules change the design path. San Marino’s design review and South Pasadena’s historic overlay both add time to the front end. Our Glendale crews know which city wants what, and the written scope names the review that applies. If you’re still deciding between an addition and a full remodel, start with our guide to Home Additions & ADU in Glendale, or see the full range on the home page.
How a Glendale ADU Project Actually Runs
An ADU in Glendale moves through four stages, and our written scope names each one so you know what you’re paying for at every step. Design and permitting first: a site survey, a title check to confirm the easements, and drawings that meet the city’s ADU standards. Second, the foundation and framing – and on hillside parcels this is where the budget lives, so we photograph the excavation and the grade beams before the concrete goes in. Third, rough trades and inspection: electrical, plumbing, and mechanical, each signed off before the walls close. Fourth, finishes and final inspection.
You get a documented photo record at each stage – not an upgrade, standard on every visit – so when the drywall goes up, you already have the pictures of what’s behind it. Uniformed, background-checked technicians do the work, and the crew on your Glendale job carries up to 19 years of experience. We use GAF and Owens Corning roofing, Kohler and Toto fixtures, and KraftMaid cabinets where the scope specifies them, and we source across fifty-plus vetted brands so the quote reflects honest material pricing rather than an inflated allowance.
What to check before you hire for an ADU
- Ask for the written scope with the exclusions listed, not just the total
- Confirm the contractor will pull the permits in their name
- Ask who handles the change order paperwork, and get the process in writing
- Get the warranty in writing before the first shovel
FAQs
How fast can you start a home addition or ADU in Glendale?
We can schedule a site visit within a few business days of your call, and the build typically starts once permits are in hand, which in Glendale generally runs several weeks to a few months depending on the design review and the parcel. For an addition or ADU, permitting is the long pole, not the labor, and we tell you the realistic timeline in writing rather than promising a start date that depends on the city. Call (844) 320-5930 to book a walkthrough.
Do you serve my area near Glendale?
Yes, if you’re in Glendale, La Cañada Flintridge, La Crescenta-Montrose, Pasadena, Altadena, South Pasadena, San Marino, or Alhambra. Those cover the core of our footprint, and we’ll confirm your address when you call rather than send you to a form. If you’re on the edge of that map, call and we’ll tell you straight – (844) 320-5930, and the estimate is free.
How much does an ADU cost in Glendale?
A detached 600- to 800-square-foot ADU in Glendale typically runs $185,000 to $285,000, while a garage conversion lands between $120,000 and $180,000. Hillside parcels and fire-zone requirements push the number up, and the written quote names each one. Call (844) 320-5930 for an exact figure on your lot – the estimate is free and it comes in writing.
Can I reach you after hours?
Yes. A live person answers the phone 24/7, so a call at 9 p.m. about a permit question or a quote you’re reviewing gets a real answer. We don’t run a call center script; we book the visit. Call (844) 320-5930 any time.
Is it cheaper to repair or add on?
It depends on the structure. If the existing foundation and framing are sound, an attached addition usually costs less than a separate structure of the same square footage because you’re reusing the walls, the roof tie-in, and the utilities. If the substrate is failing – we describe what we found, in plain terms, after we’ve opened it – a rebuild can come out ahead. We’ll review both paths with you in writing. Call (844) 320-5930 for a free second opinion on any quote you’re holding.
Rowan Construction Group Glendale builds additions and ADUs under The Haven Standard, with a written price before any work starts, signed change orders on every scope change, and the 365-Day Done Right Promise behind the finished work. If you’re planning an addition or ADU anywhere in Glendale or the surrounding foothill cities, call (844) 320-5930 for a free estimate – a live person answers, and the number comes in writing.
Written by the team at Rowan Construction Group Glendale, serving Glendale and nearby areas.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O."Fence and retaining wall along a sloped boundary. They photographed the footing depth at each post, which mattered when the county inspector came."
- Iona F.












