







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Kitchen Remodeling: The Glendale Owner’s Guide
Unilock-compatible kitchen remodeling in Glendale runs $14,000 – $45,000 for a full kitchen, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. We install Unilock-specified cabinetry, panels and finish components to the tolerances the brand’s system drawings call for, and we quote a flat written price before any work starts. Most Glendale owners discover a failing component the same way: a cabinet door that won’t stay aligned past the second week, a toe-kick panel pulling away from the floor, or a drawer glide that starts catching somewhere in the middle of its travel. Under Clause 1 of The Haven Standard, the price is written before anyone picks up a tool. Rowan Construction Group Glendale is an independent service provider and is not affiliated with Unilock.
Key Takeaways
- Full Unilock-compatible kitchen remodeling in Glendale: $14,000 – $45,000.
- Cabinet installation: $4,000 – $13,000. Countertops: $2,000 – $6,500. Backsplash: $800 – $2,500.
- Flat written price before work begins. No change proceeds without a signed change order.
- Flush-frame and frameless Unilock cabinet systems take different hinge plates – measure before you order.
Which Unilock Models This Applies To

Unilock’s kitchen line covers both framed and frameless cabinet systems, and the two are not interchangeable at the hinge. Framed boxes (the 1/2-inch face-frame construction common in the brand’s shaker and raised-panel series) use a face-frame hinge plate bored for a specific overlay – typically 1-1/4 inch, but Unilock has shipped 1-3/8 inch overlays on later runs. Frameless boxes use a full-overlay European plate with a 32mm system bore. If you order the wrong plate, the door will hang, but the reveal will be uneven at the top rail and you’ll see it every morning.
To identify your exact part, pull one cabinet door and look for the Unilock series label on the inside of the box, usually a foil sticker near the hinge side with a model code and a manufacturing date. Measure the overlay – the distance the door edge covers the cabinet face – with a tape, not by eye. The manufacturing date matters because Unilock changed hinge-plate supplier on some series, and a 2019-vintage door won’t take the same plate as a 2023 one.
On the OEM-versus-aftermarket decision: for hinges and glides, a quality aftermarket equivalent (Blum, Hettich) is often better than the OEM part and costs less. For finished panels, toe kicks and matching doors, stay with Unilock OEM – the finish run and sheen won’t match across suppliers, and you’ll see the difference under Glendale’s afternoon west light coming through a kitchen window. We source from fifty-plus vetted brands, and we’ll tell you plainly which parts to go OEM on and which to substitute.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your Unilock Kitchen Remodeling Is Failing
- Doors that drift out of alignment within weeks. The hinge plate screws are pulling from the box or the plate itself is the wrong overlay. On framed Unilock boxes, this usually means the installer bored for a 1-1/4 inch plate on a door cut for 1-3/8 inch – a spec mismatch, not a wear issue.
- Drawer glides that bind or jump mid-travel. The glide is out of level, or the drawer box has racked. In Glendale’s older housing stock, cabinet runs installed against a wall that’s out of plumb by more than 1/4 inch will rack the box over time. Shimmed correctly at install, it doesn’t happen.
- Toe-kick and end panels separating from the floor or wall. Seasonal movement. Glendale sits in a dry, warm climate with wide day-night temperature swings, and MDF-based panels expand and contract more than the solid-wood face frames they’re attached to. A failed adhesive line shows up as a hairline gap that widens in summer.
- Finish checking or peeling at the door edges. Moisture intrusion at the edge band, usually from a dishwasher or sink run where the sealant has failed. Once water gets under the band, the substrate swells and the finish lifts.
- Countertop seams opening or backsplash tile cracking at the grout line. The substrate under the counter has moved, or the cabinet run wasn’t leveled before the top went down. Unilock cabinetry is spec’d to be level within 1/8 inch over 8 feet; a top installed over a run that’s out of that tolerance will crack at the seam within a year or two.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

In Glendale, Unilock-compatible kitchen remodeling runs $14,000 – $45,000 for a full kitchen. Smaller kitchens land at $9,000 – $20,000. Line-item ranges for the parts that fail most:
| Scope | Installed Range (Glendale) |
|---|---|
| Cabinet installation (Unilock-compatible) | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash installation | $800 – $2,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Full kitchen remodel | $14,000 – $45,000 |
What drives the range: the number of cabinet boxes, whether you’re replacing doors and fronts only or the full box, the countertop material (a Cambria or Silestone quartz top sits at the high end of $2,000 – $6,500; laminate sits at the low end), and whether the substrate under the counter needs to be rebuilt. The quote you get from us is a flat price with a written scope and a written warranty – not a “call for a quote” or an hourly estimate. Parts and labor are broken out line by line so you can see what the Unilock component costs versus the install. The work carries our 365-Day Done Right Promise: if it isn’t done right, we make it right, backed by The Haven Standard terms page – not a handshake and not an asterisk.
DIY or Call Us?
Some of this you can check safely yourself. Open and close every door and drawer and watch the reveal at the top rail for uneven gaps. Run a level along the front of the cabinet run and see if it’s within 1/8 inch over 8 feet. Look at the inside of the box for the Unilock series label and note the model code and date. Take photos.
Where DIY goes wrong: re-boring a hinge plate for a different overlay is a one-shot cut. If you bore 1-3/8 inch into a door that was cut for 1-1/4 inch, the door is scrap. Pulling a countertop to inspect the substrate under it can crack the seam or the slab, and on a quartz top that’s a $2,000 – $6,500 mistake from a parts problem that started at the cabinet box. And if you have a gas range, any work that involves moving it means a licensed gas connection – we don’t touch that, and neither should you.
Start with the photo record. That’s what we do: on every visit, we document what we found and what we did, as a standard deliverable, not an upgrade. Call (844) 320-5930 to schedule a free estimate, or bring a competitor’s written quote and we’ll review it line by line at no charge – our Free Second Opinion offer.
FAQs

How long do Unilock kitchen cabinets last in Glendale? Unilock’s framed and frameless cabinet systems are typically good for 20 – 25 years in a conditioned kitchen; the parts that fail first are the hinge plates and drawer glides, not the boxes. In Glendale’s dry, warm climate, the failure point is usually finish checking at the door edges rather than structural failure. If your doors are sound and the boxes are level, a hinge-and-glide replacement at $4,000 – $13,000 for the install scope is often the honest answer. Call (844) 320-5930 for an exact quote – estimates are free.
Can a failing Unilock cabinet part be repaired instead of replaced? Yes, in most cases. A single hinge plate, a drawer glide, or a toe-kick panel can be swapped without touching the rest of the run, and that’s a small job. What can’t be repaired: a door that’s been bored for the wrong overlay, a box that’s racked beyond 1/8 inch, or a countertop with an open seam – those need replacement. We’ll tell you which category you’re in after we look. Call for a free estimate and we’ll give you a written price on the repair or the replacement, whichever is honest.
How long does a Unilock kitchen remodel take in Glendale? A full kitchen at the $14,000 – $45,000 range typically runs several weeks from demo to final inspection, depending on counter fabrication lead time and whether the substrate needs rebuilding. A door-and-fronts swap or a cabinet installation at $4,000 – $13,000 is a shorter job. We don’t promise same-day on planned construction – that would be false, and you’d know it. Call (844) 320-5930 for a written scope with a realistic timeline before you commit.
How do you source the Unilock part for my specific model? We identify the series from the label inside the cabinet box, confirm the overlay and bore spec with a tape measure, then order against the Unilock model code and manufacturing date. We source from fifty-plus vetted brands including KraftMaid, Cambria and Silestone, and we’ll tell you when an aftermarket hinge or glide (Blum, Hettich) is the better buy than OEM – and when it isn’t, for finished panels and matching doors. Every quote is a flat written price with the part name and spec on it. Call (844) 320-5930 to schedule your free estimate.
If you’re pricing a Unilock kitchen in Glendale and want a number in writing before anyone picks up a tool, call (844) 320-5930 for a free estimate. We’re background-checked and uniformed, a live person answers calls 24/7, and every visit includes a documented photo record. Bring a competitor’s written estimate and we’ll review it line by line at no charge. The written price, the signed change order and the 365-Day Done Right Promise come standard.
Written by the team at Rowan Construction Group Glendale, serving Glendale and nearby areas.












