







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU: The Glendale Owner’s Guide
If you’re planning a KraftMaid-outfitted addition or ADU in Glendale, expect an installed range of $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a full ADU, quoted as a flat written price before any work starts. KraftMaid cabinets carry a limited lifetime warranty, but that coverage applies to the cabinet box and hardware, not to the framing, roof, foundation, or utility work an addition needs – and that’s where most Glendale owners discover the gap. The typical call comes when a homeowner has the cabinetry spec sheet in hand but no written scope for the structure around it. We install KraftMaid-compatible cabinetry inside additions and ADUs across Glendale, and we put every number in writing first.
Key takeaways:
- Home addition in Glendale: $45,000 – $130,000 installed.
- ADU construction in Glendale: $90,000 – $220,000 installed.
- Garage conversion (a common ADU path in Glendale): $30,000 – $80,000.
- Every project gets a flat written price, a written scope, and a written warranty before anyone picks up a tool.
Which KraftMaid Models This Applies To

KraftMaid builds its cabinetry in a few distinct construction lines, and the line you own determines what fits inside an addition. The two broad categories are framed and frameless (full-access) construction, and the difference matters at the wall and at the corner. Framed boxes have a face frame around the opening, which gives you flexibility when a wall isn’t perfectly plumb – common in older Glendale homes where a 1920s bungalow meets a new addition. Frameless boxes give more usable interior space but demand a truer wall, which is a framing decision made long before cabinets arrive.
To identify your line, open a cabinet door and look for the specification label inside the door or on the back panel – it lists the series and finish. Measure the interior depth and the door overlay. KraftMaid offers a range of overlay options, and a replacement door or drawer front must match the overlay and hinge bore pattern exactly, or it won’t hang flush.
On the OEM-versus-aftermarket question: for doors, drawer fronts, and matching finish, OEM KraftMaid parts are the honest choice, because aftermarket fronts rarely match the factory finish and glaze. For internal hardware like drawer slides and hinges, quality aftermarket equivalents are often specified by the same manufacturers and perform identically at lower cost. We quote both options in writing so you can compare. Rowan Construction Group Glendale is an independent service provider and is not affiliated with KraftMaid. We also work with Cambria, Silestone, and Kohler for the surfaces and fixtures that complete an addition.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your KraftMaid Home Additions & ADU Is Failing
An addition or ADU rarely fails all at once. It fails at the seams – the joints between new and old, the transitions between wet and dry. Here’s what we see in Glendale:
- Doors that no longer close flush. In Glendale’s older housing stock, additions often settle at a different rate than the original structure, and the seasonal shrink-swell of clay-heavy soil shifts the frame. A door that catches at the top corner is usually a hinge or a frame out of square, not a bad cabinet.
- Drawer slides that feel gritty or stick halfway. Dust and cooking grease work into the slide track, and cheaper slides lose their dampening. The slide, not the drawer, is the failure.
- Water staining at the cabinet base or toe kick. This points to a leak behind the wall or under the floor – often a supply line or a roof transition – and it needs to be found before any cabinet work starts.
- Finish checking or peeling on door faces near a window. Glendale’s UV load fades and checks finishes on the sunny side of a room faster than the shaded side. The finish failed first; the wood underneath is usually fine.
- A soft or spongy subfloor under the cabinet run. This is the one we treat as urgent. A soft floor means moisture has reached the framing, and cabinets installed over it will fail again.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here are the installed ranges we quote in Glendale, with the line items that drive the number:
| Project | Installed Range (Glendale) |
|---|---|
| Home addition | $45,000 – $130,000 |
| ADU construction | $90,000 – $220,000 |
| Garage conversion (ADU path) | $30,000 – $80,000 |
| Cabinet installation (inside the addition) | $4,000 – $13,000 |
| Kitchen island installation | $3,000 – $10,000 |
| Countertop installation | $2,000 – $6,500 |
What moves the range: foundation type (slab versus raised), whether the addition needs a new roofline tied into the existing one, utility runs (electrical panel capacity, gas, water, sewer), and the level of finish. A flat written scope names each of these. We don’t quote “call for a price” – the number is on paper before work starts, and a change order must be signed before any change proceeds. Every visit includes a documented photo record, and the 365-Day Done Right Promise backs the work.
DIY or Call Us?
Some checks are safe and worth doing yourself. Open every cabinet door and drawer and note which ones stick. Look under the sink and at the toe kick for staining. Press on the subfloor near the cabinet base. Photograph the spec label inside a door so you have the series and finish ready.
Where DIY goes wrong is in the structure. Moving a wall, tying a new roof into an existing one, running a new electrical circuit, or extending a gas line are not homeowner jobs, and getting them wrong is dangerous and expensive to undo. Permits and inspections are part of the work in Glendale, and the inspection record is your protection. Our technicians have up to 19 years of experience, are background-checked and uniformed, and a live person answers calls 24/7. Call (844) 320-5930 for a free estimate – and if you have a competitor’s written quote, we’ll review it line by line at no charge as a free second opinion.
FAQs

How long does KraftMaid cabinetry last in an addition? KraftMaid’s cabinet boxes and hardware carry a limited lifetime warranty, and in practice a well-built box lasts decades. The parts that wear are hinges, slides, and finishes – typically the first to need attention within 10 to 20 years in a sunny Glendale room. Call (844) 320-5930 for a written assessment of what needs replacing versus what’s fine.
Can it be repaired instead of replaced? Often, yes. Hinges, slides, and single doors or drawer fronts can be swapped without touching the box, which keeps the cost low. Structural or water damage to the box or subfloor means replacement, not repair. We’ll tell you which one you’re looking at, in writing, before any work starts.
How long does the swap take? A hardware or door-front swap is typically a single-day job. A full addition or ADU is a multi-month project with permits and inspections – the written schedule we hand you names each phase. Call (844) 320-5930 to get a scope and timeline in writing.
How do you source the KraftMaid part? We order OEM KraftMaid doors, fronts, and finish-matched pieces through authorized channels, and specify quality aftermarket equivalents for internal hardware where they perform the same. You see both options priced in writing. Estimates are free.
Ready to put a number on paper? Call Rowan Construction Group Glendale at (844) 320-5930 for a free estimate on your Glendale addition or ADU, with a flat written price and a written scope before any work begins.
Written by the team at Rowan Construction Group Glendale, serving Glendale and nearby areas.












